Detailed Environmental Impact Assessment
Name of project Project implementer Project location Date Appendix
61 SAINSHAND 50MW WIND PARK PROJECT “SAINSAND SALKHIN PARK” LLC SAINSHAND, ALTANSHIREE, URGUN SOUM, DORNOGOBI AIMAG 2020-04-01 ХАРАХ
62 PROJECT TO SWITCH COAL GAS HEATING TECHNOLOGY FROM STEEL BALL MILL TO INDUCTION FURNACE TECHNOLOGY AT STEEL BALL PLANT “ERDENET STATE OWNED INDUSTRY BAYAN-UNDUR SOUM, ORKHON AIMAG 2020-01-08 ХАРАХ
63 ADDITIONAL NOTES TO THE OPEN MINING PROJECT FOR THE KHUUTI COAL DEPOSIT “MONGOLIAN ALT (МАК)” LLC BAYANJARGALAN SOUM, DUNDGOBI AIMAG 2020-01-07 ХАРАХ
64 AMENDMENTS TO THE KHUKH TSAV LIMESTONE OPEN PIT MINING PROJECT “MAK CEMENT” LLC ДОРНОГОВЬ АЙМАГ, ДАЛАНЖАРГАЛАН СУМDALANJARGALAN SOUM, DORNOGOBI AIMAG 2020-01-07 ХАРАХ
65 BUILDING MATERIALS LABORATORY PROJECT AT MAC-EURO CEMENT PLANT “MAK CEMENT” LLC 5TH BAGH, DALANJARGALAN SOUM, DORNOGOBI AIMAG 2020-01-06 ХАРАХ
66 AMENDMENTS TO THE CHEMICAL WAREHOUSE, CHEMICAL IMPORT, STORAGE AND TRADE PROJECT “MSM GROUP” LLC 3RD KHOROO, KHAN-UUL DISTRICT, ULAANBAATAR 2020-01-05 ХАРАХ
67 PARKING AND HEAVY MACHINERY REPAIR CENTER PROJECT “TERA EXPRESS” LLC UMNUGOBI AIMAG, KHUREN BOOMT, GURVANTES SOUM UMNUGOBI AIMAG 2020-01-04 ХАРАХ
68 PARKING AND HEAVY MACHINERY REPAIR CENTER PROJECT “TERA EXPRESS” LLC OYU TOLGOI PROJECT, KHANBOGD SOUM, UMNUGOBI AIMAG 2020-01-03 ХАРАХ
69 10 MW SOLAR POWER PROJECT IN SUMBER “ESB SOLAR ENERGY” LLC SUMBER SOUM, GOBI-SUMBER AIMAG 2020-01-02 ХАРАХ
70 CHEMICAL STORAGE PROJECT “GYALALZAKH GEREL” LLC 13TH KHOROO, DARKHAN SOUM, DARKHAN-UUL AIMAG 2020-01-01 ХАРАХ
71 PLASTIC INDUSTRY EXPANSION PROJECT “METRO PLAST” LLC 20TH KHOROO, BAYANGOL DISTRICT ULAANBAATAR 2019-10-31 ХАРАХ
72 LIQUID GLASS MANUFACTURING PROJECT “CHP-2” STATE OWNED COMPANY 20TH KHOROO, BAYANGOL DISTRICT ULAANBAATAR 2019-10-30 ХАРАХ
73 CHEMICAL STORAGE, CHEMICAL IMPORT AND TRADE PROJECT “МСМ GROUP” LLC KHAN-UUL DISTRICT, ULAANBAATAR 2019-08-29 ХАРАХ
74 CUSTOMS CONTROL AREA PROJECT “AR OYU TRADE” LLC TSAGAAN KHAD, KHAIRKHAN BAG, KHANBOGD SOUM, UMNUGOBI AIMAG 2019-05-30 ХАРАХ
75 181 KM PAVED ROAD PROJECT TO BE CONNECTED TO ULAANBAATAR-UNDURKHAAN PAVED ROAD FROM SHURDAG RIVER GOLD DEPOSIT LOCATED IN BATSHIREET SOUM OF KHENTII AIMAG CROSSING UMNUDELGER SOUM “PEGMATIT MINING” LLC BATSHIREET, UMNUDELGER AND JARGALTKHAAN SOUMS, KHENTII AIMAG 2019-05-26 ХАРАХ
76 289 KM LONG “PAVED ROAD CONSTRUCTION PROJECT” FROM KHOTGOR COAL MINE LOCATED IN SHINEJINST SOUM OF BAYANKHONGOR AIMAG TO NARIIN SUKHAIT COAL TRANSPORTATION ROAD OF GURVANTES SOUM OF UMNUGOVI AIMAG “GOBI COAL AND ENERGY” LLC SHINEJINST SOUM, BAYANKHONGOR AIMAG AND GURVANTES SOUM, UMNUGOBI AIMAG 2019-05-25 ХАРАХ
77 CONSTRUCTION MATERIALS FACTORY PROJECT / POLYSTYRENE INSULATION BOARD, STONE POLISHING MATERIALS, DRY MIX FACTORY / “PYRAMID INDUSTRY” LLC KHAN-UUL DISTRICT, ULAANBAATAR 2019-05-15 ХАРАХ
78 ELECTRONIC AND CHEMICAL BATTERY RECOVERY PROJECT “ELECTROCHEM MONGOLIA” LLC KHAN-UUL DISTRICT, ULAANBAATAR 2019-05-01 ХАРАХ
79 POLYURETHANE FOAM COATING PLANT CONSTRUCTION PROJECT “METRO CHEM” LLC BAYANGOL DISTRICT, ULAANBAATAR 2019-04-15 ХАРАХ
80 AMENDMENT TO TOURIST CAMP PROJECT “MONGOL ALTAI TRAVEL” LLC GORHI TERELJ NATURAL PARK, NALAIH DISTRICT, ULAANBAATAR 2019-04-01 ХАРАХ